1-3 floor – total air capacity 50 000 m3/h. For ventilation and conditioning each floor has two sets of 25 000 m3/h. Ventilation units are equipped w...
Ventilation system performance reaches 22300 m3/h. Ventilation system performs the functions of drainage, heating, cooling, support temperature, rela...
Aqua-Lux, Vinnitsa won a tender for the design, installation and maintenance of a substation in a premium class residential building. In the house at ...
Boiler house with 1.52 MWt output capacity. Installed two steel boilers Strebel(Austria), with a possibility of third boiler installation, with output...
Installation and start up works for the boiler house with 2.7 MWt heat output capacity, for the heating of the Vinnitsa Train Station buildings. ...
Furnace house for administrative and warehouse buildings of Nemiroff Liquor Plant, with capacity of 180 kWt.
Boiler house with 1.8 MWt capacity. Boiler house has two boilers Viessman Vitoplex SX 200 with 900 kWt capacity, which completely cover heat loss of t...
Project, construction, and equipment installation works for the boiler house with 260 kWt capacity in Satanov town. Boiler automatic, without ever-...
Reconstruction of boiler house, replacement of E1/9 boiler, for BBC boiler (Germany), with steam production capacity 4 t/hour. Aqua-Lux, Vinnitsa h...