Projects

Fire alarm and smoke removal systems for The Mall 5 700 sq.m.

The smoke removal and fire alarm system in The Mall 5,700 sq.m. in Vinnytsia includes the following security systems: smoke protection systems ...

Fire fighting systems for the Premier-Tower residential complex 44 000 sq.m.

The fire-fighting and fire alarm system in the 44 000 square meters Premier-Tower residential complex with commercial premises in Vinnytsia with a par...

Fire fighting systems for warehouses class A+ 20,000 square meters.

The fire extinguishing and fire alarm system at AVRORA Class A warehouses with an area of 20 thousand square meters in Vinnytsia includes the followin...

Engineering Systems of The Premier Tower Residential Complex in Vinnitsa

Engineering systems of the 14th-floor Premier Tower Residential Complex include: Three-zone hot and cold water supply systems with modern Culligan ...

Engineering Systems of The Mall Shopping and Office Center in Vinnitsa

Engineering systems of the shopping and office center with total area of 11 800 sq.m. (of which 5,500 are boutiques and 4,700 are offices) are based o...

Resort Medical & SPA Arden Palace Khelnitsk-Sataniv

AQUA-LUX, VINNITSA company, from September 2019 to September 2020, fully fulfilled contract obligations for the installation and commissioning of the ...

Heating, ventilation and microclimate system of the shopping center “Barbara”

Aqua-Lux, Vinnitsa LLC completed the design, supply, installation and commissioning of engineering systems for heating, ventilation and air conditioni...

Sport and recreation complex “Freestyle”

Our company have carried out the control of design and exploration work, as well as the delivery and author's control of the installation of technolog...

Water heating boiler house Bazhenova 15A Vinnitsa

The first stage of heating plant on Bazhenova 15A Vinnitsa thermal capacity of 18 MW: 1. Installation of industrial pipelines 2. Installation of w...

Boiler modernization with staff burners replacement

Automation and modernization of TVG-8M boiler with burners replacement Riello RS 250/M in boiler room in Ivano-Frankivsk Doroshenko street 28a: 1. ...

Radisson Resort & Spa, Alushta

Installation, commissioning and maintenance of engineering systems in the hotel “Radisson Resort & Spa, Alushta” Crimea, Alushta Street. 2 Lenin. ...

Aquapark “Mayak”, Vinnitsa

Total volume pools – 1230 cbm. -Automatic maintainance the temperature of water and disinfection. Total performance of ventilation system – 22300 m³ /...

Pool Hotel Radisson SAS Resort Alushta

Water treatment plant design for the room fund of the hotel Radisson Resort & Spa, Alushta, circulating water supply of the pools in SPA comlex. H...

Waterpark resorts “Vinnitsa” Koblevo

Total volume of the swimming pools is 219 m3. Separate pool with depth of only 0,4 m, with “Pirate Ship” water slide was built especially for children...

Swimming pools and saunas at private households

In private pools, we are ready to implement almost any wishes of the customer. We will build your dream pool,  whether is 3 meters in diameter or the ...

LLC “TIROTEKS”, Tiraspol

Умягчение питательной воды для системы когенерации производительностью 90 куб.м/час ...

Poninkovsky CSC

Preparation of feed water for steam boilers of surface source capacity of 20 m / h

Nemiroff Liquor Plant

Water treatment for the production of alcoholic beverages with capacity of 63m3/hour. Mechanical filtration, deferizzation, demineralization and rever...

Borispol Airport

Mechanical filtration, deferizzation, disinfection of water supply.

Water treatment for utilities

Water treatment includes the following process stages: Mechanical filtration, disinfection. Total capacity 20,000 m3 / day

Private houses water treatment

Water treatment technology depends of technical conditions and advanced analysis of water source.

Drinking water treatment by local plants

In the programm “Drinking Water of Ukraine ” Aqua-Lux, Vinnitsa has developed project and technical documentation for the installation of drinking wat...

Water treatment for PRaT “Vinnitsabythim”

Water treating consists of 4 stages: mechanical filtration, softening, dechloration, reverse osmosis (RO). Water treatment plant capacity is 4,5 m3/ho...

Steam boiler room airport Borispol

Boiler heating facilities site 1 RC RSP Kievtcentraero