Engineering systems of the 14th-floor Premier Tower Residential Complex include:
Three-zone hot and cold water supply systems with modern Culligan water purification systems for housing. Water heating roof boiler room to cover the heating needs of the housing stock.
The heating and air conditioning of the premises is carried out by the latest generation VRV system to ensure the maintenance of a given microclimate of the commercial premises of the building.
Fire Safety System: