Water heating boiler house Bazhenova 15A Vinnitsa

The first stage of heating plant on Bazhenova 15A Vinnitsa thermal capacity of 18 MW:
1. Installation of industrial pipelines
2. Installation of water treatment systems and commissioning
3. Installation of the boiler control
4. Design and installation of fire alarm systems